BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 13, 2026 at 8:00 PM

Updated May 14, 2026

Renovation of an educational facility in Cleveland, Ohio. Completed plans call for the renovation of a educational facility.

We are converting a virtual welding lab into a new Art Room. Many of the cabinets from the old art room will be reused in this project. The work in this phase consists of electrical, mechanical, carpentry, flooring and interior painting. Going forward the two former art rooms will be conbined and converted into one state of the art welding lab with the design help of Lincoln Electric and will be bid in the near future. The JFK campus will feature academic programming that is personalized toward individual students' success, preparing them for postsecondary education and/or career exploration. The New JFK features two pathways sure to excite, develop and prepare all students for the next phase of their journey. The pathways are as follows: An innovative college preparatory curriculum that provides access to two-and four-year institutions, including but not limited to Tri-C, Hiram College and Cleveland State University and the AVID college-readiness program. A career-technical pathway featuring a focus on but not limited to advanced manufacturing, including welding and CNC machinery. This will be held in conjunction with MAGNET's Early College Early Career program and Cuyahoga Community College. Pathways will integrate rigorous courses that will allow students to engage in complex academic tasks that challenge them, promote critical thinking and foster a passion for self-directed learning through authentic experiences. Question Deadline 05/01/2026 at 4:00 PM ET All final questions from service providers to the District. Answers to service providers from the District and all addenda issued (if necessary):May 8, 2026, 4:00pm Bid Award:May 22, 2026 Contract Negotiation :May 26, 2026 A Certified Check for 10% of the total amount of the bid payable to the Treasurer of the Cleveland Metropolitan School District, or satisfactory bid bond executed by the bidder or a Surety company on a form supplied by the bondsman. Isabelle Del Turco, RFI Point of Contact/Specification Coordinator - idelturco@avgl.com The Project consists of the alteration of existing Modular Tech Lab 106 to New Art Room.. Work includes selective demolition, relocation and installation of existing cabinetry and visual display boards from Art Rooms 127, 156 and storage rooms within the art rooms, interior finishes, and work as indicated on drawings. Also included in the work is associated Mechanical, Electrical, Plumbing, Structural and Technology. The District reserves the right to reject any and all proposals, to waive any and all informalities or irregularities, and to disregard all non-conforming responsive conditional proposals. Each Proposer is liable for all proposal errors or omissions. A proposer shall not be permitted to alter or amend any proposal documents after the Proposal deadline time and date detailed in the ITB unless such is formally requested, in writing, by the District.

Bid Results

Educational

$224,100.00

Public - City

Renovation

27

15

67

5

Subscribe For Documents

41 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 11, 2026

May 29, 2026

Project location map

15111 Miles Park Ave, Cleveland, OH

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.