BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 7, 2026 at 8:00 PM

Updated May 16, 2026

Site work and paving for a civil project in Belvidere, Illinois. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

As of May 5, 2026, this project has not yet been awarded. The project is expected to be awarded on May 22, 2026. Work included shall include the removal and replacement of the single span slab bridge (SN 004-3008) with a new 12"x6" precast concrete box culvert with cast in place end sections and wing walls. Project includes approximately 230 feet of precast concrete box culvert, 20,000 pounds of epoxy coated rebar, 100 cubic yards of concrete box culverts, and 490 square yards of waterproofing membrane for structures Project Location: Stone Quarry Road Prequalification of Bidders. Proposals Requiring Prequalification of Bidders Will Be Issued Only to Those Contractors WHO Are Qualified With the Department of Transportation. Prequalification Forms May Be Secured From the Engineer of Construction, Administration Building, 2300 South Dirksen Parkway, Springfield, Il 62764. IL DOT - Removal and Replacement of the Single Span Slab Bridge - Stone Quarry Road Cost Estimate: $1,057,494.50 If you have questions or need any additional information regarding the above, please contact John Massa, P.E., at (815) 284-5384

Bid Results

Bridges / Tunnels

$997,084.00

Public - County

Paving, Site Work

21

7

2

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
685
Active Projects
311
Bidding Soon
3,991
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 4, 2026

July 3, 2026

Project location map

Stone Quarry Rd, Belvidere, IL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.