BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 14, 2026 at 8:00 PM

Updated May 15, 2026

Demolition, site work and addition to an educational facility in Pine Bluff, Arkansas. Completed plans call for the addition of a educational facility; for the demolition of a educational facility; and for site work for a educational facility.

The University of Arkansas at Pine Bluff is seeking architectural services for the design of an expansion and wing addition to the Hathaway Howard Fine Arts Center. This project involves the construction of a new multi-story Art Tower addition to enhance and modernize the existing facility, expand instructional capacity, and support 21st-century art education. The Art Tower will be a multi-use extension providing new classrooms, studios, and creative learning spaces for ceramics, design, and digital arts. The new structure will be a vertical addition to the front of the existing building, creating a modernized faade. The project includes all necessary utility work, building systems integration, and site improvements to support the expanded facility. The method of Contractor Selection has not been Determined at this time. "Requests for proposals for design services is underway."

Post-Bid

Educational

$5,200,000.00

Public - State/Provincial

Addition, Demolition, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
59
Active Projects
27
Bidding Soon
334
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 14, 2026

May 14, 2027

Project location map

1200 N. University Drive, Pine Bluff, AR

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.