BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 29, 2026 at 8:00 PM

Updated May 20, 2026

Renovation of a mixed-use development in Murfreesboro, Tennessee. Conceptual plans call for the renovation of a medical facility.

This work consists of upgrading the existing video surveillance security monitoring system at the Alvin C. York Campus of the Tennessee Valley Healthcare System to provide a fully integrated and modernized platform. The project includes removal and replacement of outdated or inoperable field equipment, installation of new cameras, network video recorders, display systems, communication components, and associated infrastructure. The upgraded system shall incorporate artificial intelligence-enabled video analytics to enhance monitoring, detection, and response capabilities across the campus. Work includes demolition and new construction and may involve general construction, civil, architectural, electrical, low-voltage, industrial hygiene, and related trades. The contractor shall furnish all supervision, labor, materials, equipment, and transportation necessary to complete the work in strict accordance with the drawings and specifications prepared by an architectural-engineering firm. Integration with existing infrastructure requires use of brand-name Avigilon systems and equipment, and contractors must be authorized to install and service Avigilon products. The scope also includes installation of new Cisco PoE switches, patch panels, power distribution units, receptacles, fiber cabling, and Avigilon rack-mounted NVR systems with a minimum of 30 days of recording retention, coordinated with VA OIT. All work shall be phased to maintain continuous operation of existing cameras until replacements are fully operational, comply with VA, NFPA, OSHA, and Joint Commission requirements, and be performed during approved hours to minimize disruption to medical center operations. The period of performance is up to 270 calendar days, with phased bid options based on floor exclusions. Location: Tennessee Valley Healthcare System, Alvin C. York Campus, VA Medical Center, 3400 Lebanon Road, Murfreesboro, TN 37129 Period of Performance for all work is 270 calendar days. The estimated cost magnitude is between $1,000,000.00 and $5,000,000.00 The Method of Contractor Selection has not been determined at this Time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Conceptual

Medical

$5,000,000.00

Public - Federal

Renovation

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 3, 2027

Project location map

3400 Lebanon Rd, Murfreesboro, TN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.