Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 18, 2026 at 8:00 PM
Updated May 20, 2026
Renovation of an industrial development in Surry, New Hampshire. Completed plans call for the renovation of a 11,200-square-foot industrial development.
The City of Keene is seeking bid proposals from qualified contractors for the Keene Recycling Center Roof Replacement. The project includes but is not expressly limited to the following scope of work: re-roofing over the existing metal 11,200 square foot roof with insulation and new metal roofing. 1. The Contractor shall furnish all labor, materials, equipment, supervision, and incidentals necessary to complete the reroofing of the recycling building as specified herein. 2. All work shall be performed in accordance with manufacturer specifications, industry standards, and all applicable local, state, and federal codes. 3. The Contractor shall coordinate all work to ensure minimal disruption to facility operations. 2. Site Protection and Preparation 1. The Contractor shall provide adequate protection of all surrounding areas, including adjacent structures, equipment, and ground surfaces. 2. Protection measures shall include tarps, barriers, and other necessary means to safely remove and dispose of debris. 3. The Contractor shall ensure that no damage occurs to the property during the execution of the work. 4. All debris generated from the project shall be promptly removed and disposed of in accordance with applicable regulations. 3.1 Insulation System o Install polyisocyanurate insulation boards (1/2-inch, 1-inch, and 3-inch) per manufacturer specifications. o Fill metal roof flutes with 3-inch insulation. o Install 2-inch insulation over flutes. o Fasten insulation with screws and plates at a rate of 2 per 4 square feet. o Achieve LTTR value of approximately 14. 3.2 Wood Nailers o Install kiln-dried 2" x 12" nailers at eaves. o Install continuous 2" x 6" nailer over infill nailers. o Ensure all wood is level and secure. 3.3 Edge Metal and Perimeter o Install 24-gauge T-type edge metal. o Install PVC-laminated hook strip. o Heat-weld hook strip to membrane. 3.4 Roofing Membrane o Install one of the following: 60 mil TPO, EPDM, or SikaPlan PVC. o Ensure proper adhesion and sealing per manufacturer. o Heat-weld seams where applicable. 3.5 Flashing and Penetrations o Re-flash all curbs, vents, and penetrations. o Use compatible materials. o Ensure watertight seal.
Sub-Bidding
Industrial
$200,000.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 26, 2026
June 25, 2026
55 Old Summit Rd, Surry, NH
Related To This Project
Surry, NH
Bid Date: May 21 2026
Surry, NH
Bid Date: Jan 14 2026
Surry, NH
Bid Date: Jul 07 2025
Surry, NH
Bid Date: Apr 24 2025
Surry, NH
Bid Date: Oct 24 2024
Surry, NH
Bid Date: Sep 18 2024
Surry, NH
Bid Date: Sep 12 2024
Surry, NH
Bid Date: Aug 09 2024
Surry, NH
--
Surry, NH
Bid Date: Aug 27 2024
Surry, NH
Bid Date: Mar 13 2024
Surry, NH
Bid Date: Aug 24 2021
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
