Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 13, 2026 at 8:00 PM

Updated May 19, 2026

Demolition, site work and paving for a mixed-use development in Monroe, Michigan. Completed plans call civil work for an educational facility and sidewalk / parking lot.

The Monroe County Intermediate School District (MCISD) is seeking bids for qualified contractors for the demolition and replacement of the district's asphalt bus loop driveway. The project consists of milling and resurfacing asphalt pavements, including a 2-inch mill and overlay, along with designated patching, crack filling, and sealing areas. Work is scheduled to take place between June 19, 2026, and August 14, 2026.

Post-Bid

Sidewalks / Parking Lot

$500,000.00

Public - County

Demolition, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
361
Active Projects
174
Bidding Soon
2,636
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 11, 2026

June 19, 2026

Project location map

1101 S. Raisinville Rd., Monroe, MI

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed