BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 26, 2026 at 8:00 PM

Updated May 29, 2026

Site work and new construction of a water / sewer project in Waurika, Oklahoma. Completed plans call for the construction of a water / sewer project.

Construct two new clarifiers, flow splitter, retention holding pond, three multi-media filter units, filter building, chemical feed building, and all appurtenances required as shown on the plans and described in the specifications for a fully operational facility. The work covered by these specifications and drawings shall consist of all materials, transportation costs, equipment, and tools that are related to, or are to be incorporated in this contract and must be received, unloaded, stored, installed, erected, service connections provided, and coordinated with the construction by the CONTRACTOR under this contract. Installation of equipment and materials shall mean furnishing of all labor and materials as required to place the improvements in successful operation. The CONTRACTOR shall be responsible for all equipment and materials and shall replace at his own expense all such equipment and materials found defective in manufacture or damaged in handling after delivery by the manufacturer. The improvements are as listed: Waurika Public Works Authority WAURIKA WTP EXPANSION B. This contract shall include minor items not specifically mentioned herein but shown on the accompanying plans or obviously necessary to provide a complete job. C. The following description, while not intended to cover all details, outlines some items of the work to be accomplished under this Contract: 1. Construct one (1) flow splitting structure, two (2) clarifiers, three (3) multimedia filters, two (2) GAC filters, one (1) chemical building, one (1) residuals lagoon. 2. Construct all process piping and appurtenances to operate a functioning system. Note: The water treatment plant must stay in operation throughout construction. Temporary pumping, piping, plugs, shut offs, etc. shall be considered incidental and included in the cost of other bid items. D. The price named in the Proposal shall include the furnishing of all labor, material, transportation costs, equipment rental, etc., necessary to construct the project as herein specified and as shown on the accompanying plans. E. The CONTRACTOR shall cooperate with the OWNER during construction so as to place the improvements in operation at minimum inconvenience and without significant disruption of the OWNER. The CONTRACTOR shall minimize his area of operation. Any areas disturbed will be restored to the OWNER'S satisfaction

Post-Bid

Water / Sewer

$6,000,000.00

Public - City

New Construction, Site Work

45

24

4

4

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
123
Active Projects
66
Bidding Soon
996
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 28, 2026

July 27, 2026

Project location map

To Be Determined, Waurika, OK


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.