BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 15, 2026 at 8:00 PM

Updated May 16, 2026

Site work for a power facility in Milton, Wisconsin. Completed plans call for site work for a power facility.

The project involves turnkey installation of ground-mounted, utility-interactive photovoltaic (PV) systems at two municipal well sites in the City of Milton. The work includes installation of two 59.52 kW PV systems at Well #5 (240 N. Janesville Street) and Well #6 (1389 E. Storrs Lake Road). Contractors are to provide all required design, engineering, permitting, and coordination of interconnection; furnish and install PV modules, inverters, racking, and monitoring systems; construct perimeter fencing and access gates; handle site preparation including grading and stabilized ground cover; carry out all electrical connections including load-side taps and service integration; coordinate with the local utility and ensure code compliance; and provide online monitoring and performance reporting. Bidders must supply all labor, materials, tools, equipment, and incidentals for a complete, operational system. All bids must be accompanied by a bidder's bond equal to five percent of the total bid. The City intends to pursue federal Investment Tax Credits and all necessary documentation and compliance measures must be included to support eligibility. The City reserves the right to reject any or all bids and to waive any informalities or technicalities. The award will be made to the lowest responsible and responsive bidder, unless all bids are rejected. The selected vendor will be responsible for a total "turnkey" project including all necessary equipment, materials, design drawings, manufacturing, permits, rebates, site preparation, and installation services for the ground-mount utility interactive Photovoltaic (PV) systems. All solar arrays must have online energy monitoring and performance package. Attached are PV system summaries provided by Upper 90, from Helioscope, detailing proposed locations, applicable equipment, and sizing. Proposed arrays are ground-mounted fixed-tilt systems and should not interfere with the existing operations of the wells. Provide PV modules and inverters from reputable, bankable manufacturers. PV modules shall be considered Tier 1 by a recognized industry finance entity. Submitted equipment shall have established product history, manufacturer warranty support, and readily available technical/service support in the United States. Provide and install a complete perimeter fence and lockable access gate around the solar array. Fence shall be commercial-grade chain-link construction, to match existing fence height or minimum 6 feet whichever is greater, galvanized steel, with all posts, rails, mesh, fittings, bracing, and concrete footings required for a complete installation. Gate shall be sized to allow maintenance and equipment access and shall include lockable hardware. Coordinate final fence height, gate size, materials, and layout with owner requirements, utility requirements, and applicable local codes. Provide a stabilized ground system beneath the solar array in all disturbed areas. Acceptable systems include approved stone or gravel stabilization. Contractor shall include all work required for a complete installation. Contractor shall coordinate permitting process with GEC (General Engineering Company). Location: Well 5 o Address: 240 N Janesville Street, Milton WI o 59.52 kW PV System o Interconnection detail: load side tap in the existing fused service disconnect outside & ahead of the transfer switch. o See attached one-line diagram for entire electrical overview. o Currently has no existing internet service o See attached Batterman Conceptual Drawings for array location given future sports complex Location: Well 6 o Address: 1389 E Storrs Lake Road, Milton WI o 59.52 kW PV System o Interconnection detail: load side tap between the main service disconnect inside and the transfer switch. o See attached one-line diagram for entire electrical overview. o Currently has no existing internet service o Interconnect any added fencing to existing fence layout to maintain one continuous fence Est. Completion Date: Sept. 30, 2026

Sub-Bidding

Solar Power Generation

$300,000.00

Public - City

Site Work

23

3

2

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
621
Active Projects
304
Bidding Soon
3,646
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 21, 2026

June 1, 2026

Project location map

Multiple Locations, Milton, WI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.