BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 13, 2026 at 8:00 PM

Updated May 15, 2026

Site work for a water / sewer project in Kenner, Louisiana. Completed plans call for site work for a water / sewer project.

Question Deadline 05/18/2026 at 1:00 PM CT For all inquiries (except SLDBE), please direct them to the following: NOAB Procurement Department, Louis Armstrong New Orleans International Airport, 1 Terminal Drive, 3rd floor, Kenner, Louisiana 70062. E-mail: procurement@flymsy.com. Purchasing related inquires, a bidder shall submit its question in writing to the appropriate point of contact no later than seven (7) business days prior to the Bid Deadline Chill Water Pipe Insulation Replacement for chilled water pipe installation. No price breaks, add-on charges, or alternate responses allowed. The work is to be performed at Louis Armstrong International Airport, Kenner, LA. The City of New Orleans (City) and New Orleans Aviation Board (NOAB) solicits bids to obtain a contract for the replacement of the Chill Water Pipe Insulation for the South Terminal of the Louis Armstrong New Orleans International Airport. This project is located within the ground floor of the South Terminal at Concourse C, CBP, CBP Lobby, and East Terminal where served by the West Plant. The work for this project includes, but is not limited to, the following: 1. Furnish and install new insulation on all bare CHWS/R Piping and remove/replace any remaining insulation on CHWS/R piping. 2. Pipe hangers are to be replaced as identified in the bidding documents. 3. Work to HWS/R piping is not a part of this project, unless noted otherwise. 4. Refer to Exhibit 1 - Specifications for full plans and specifications (PLEASE NOTE: A Non-Disclosure Agreement is required to review the plans/specifications for the purposes of this solicitation. Please see Attachment A-2 [CONFIDENTIALITY AND NON-DISCLOSURE AGREEMENT], fill out and return the document in accordance to the instructions outlined in the NDA.)

GC Bidding

Water / Sewer

$1,100,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
172
Active Projects
50
Bidding Soon
566
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 28, 2026

July 27, 2026

Project location map

1 Terminal Dr, Kenner, LA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.