Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 7, 2026 at 8:00 PM
Updated May 16, 2026
Renovation of a civil project in Buckeye, Arizona. Completed plans call for the renovation of a water / sewer project.
This project is for the rehabilitation of the Central WRF Basin A and Effluent Station. Questions Due Date: May 19th 2026, 3:00 PM MST Online Portal Contact Information: Travis M. Stewart, tstewart@buckeyeaz.gov The City of Buckeye Water Resources Department is conducting rehabilitation of its 1.5-million-gallon (MG) wastewater treatment Basin "A" located at its Central Beloat Wastewater Reclamations Facility (WRF) located at 915 South 7th Street Buckeye, Arizona 85326. This project is a federally funded Army Corps of Engineers 595 Program and will need to meet the Build American/Buy American (BABA), Davis Bacon Certified Payroll, American Iron and Steel (AIS) governmental requirements. The Central WRF Basin A and Effluent Station Rehabilitation will consist of the following: o Rehabilitation of the Mixed Liquor Return (MLR) pumping system and piping. Replace current 25hp Hydrostol pumps with Flygt pumps (similar to Basin "C") for equipment standardization and continuity. Palletize and relocate current equipment to storage area. o Purchase and installation of a new Sanitaire or equivalent fine bubble air systems for basins 3, 4, 5, 6, and 9. o Installations of new mixing pump assemblies for basins 1, 2, 3, 7 and 8 (Flygt or approved equal). o Installation of new Dissolved Oxygen (DO) sensors and control units for all required basins: 1, 2, 3, 4, 5, 6, 7, 8, and 9 (HACH or approved equal). o Purchase and installation of new 20hp Flygt Return Activated Sludge (RAS) pumps 1 thru 3 for RAS station. o Purchase and installation of new mud valves for basins 3, 4 and 7. o Purchase and installation of new control sluice gates in front of basin 3. o Remove current 250hp Kaeser blower and purchase and replace with 1 new Aerzen blower of equal size and CFM (3,019 SCFM at 11 PSIG). o Conduct start up and training for operational staff related to the new and rehabilitated equipment related to Basin "A" 's operation. All correspondence relating to this Project should be addressed to the Senior Contracts Administrator, Travis M. Stewart, via the solicitation page in the City's Procurement Portal.
GC Bidding
Water / Sewer
$1,500,000.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 26, 2026
July 10, 2026
915 S 7th St, Buckeye, AZ
Related To This Project
Buckeye, AZ
Bid Date: Jun 04 2026
Buckeye, AZ
Bid Date: May 07 2026
Buckeye, AZ
Bid Date: Jun 08 2026
Buckeye, AZ
Bid Date: Jun 08 2026
Buckeye, AZ
Bid Date: May 13 2026
Buckeye, AZ
Bid Date: May 14 2026
Buckeye, AZ
--
Buckeye, AZ
--
Buckeye, AZ
--
Buckeye, AZ
--
Buckeye, AZ
Bid Date: Apr 06 2021
Buckeye, AZ
Bid Date: Sep 02 2021
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
