Published May 14, 2026 at 8:00 PM
Updated May 14, 2026
Demolition, site work and new construction of an educational facility in Sacramento, California. Completed plans call for the construction of a one-story above grade educational facility.
The project includes the relocation of two (2) portable classrooms from Genevieve Didion to Abraham Lincoln. During the disconnection of the portables at the Didion Site, fiber must be pulled back and coiled in the closest pull box. All low voltage and power are to be disconnected, pulled, and coiled in a pull box 5'-0" away from the building footprint. All remaining utilities also need to be disconnected and capped in a new utility box 5'-0" away from the existing building footprint for ease of connection for the next phase on that site. The existing ramp at Didion needs to be demolished and not moved to the new site. All internal components for the IDF cabinet are to be moved with the building to the new site. When the two classrooms are moved to the Abraham Lincoln Site, they may have to be stored on cribs until the building pad is ready. The building pad is a depressed slab and wood foundations. The building comes with the IDF cabinet with all components for these two classrooms. The scope includes reconnecting all low voltage systems such as data, intercom, intrusion, and fire alarm, and connecting them to existing campus systems to make them operational. New power will be provided to these classrooms as shown in the drawings and connected to the closest panel. Water and sewer connections will be made on site as needed. The project also includes fencing modifications with mow curbs as shown in the drawings, and providing venting for the depressed foundation area so that the floor finish is flush with new concrete walks. Both new classroom buildings will be painted to match campus colors. All roof downspouts are to be connected to the underground storm drainage system. Concrete aprons will be installed as shown in the drawings, and all damaged classroom ceiling tiles will be replaced as needed. Both buildings are to be completely operational on completion. The Bidder shall submit questions to Ryan Wade at Rwade@Kitchell.com, Darren Sorgea at Dsorgea@Kitchell.com, Robert Aldama at robert-aldama@scusd.edu, Tina Alvarez-Bevens at contracts@scusd.edu . Bidder's questions shall be submitted no later than May 7, 2026; 2:00 P.M. Board Meeting to Award contract June 4, 2026
GC Bidding
Educational
$700,000.00
Public - City
Demolition, New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 15, 2026
June 5, 2026
3324 Glenmoor Dr, Sacramento, CA