Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 13, 2026 at 8:00 PM

Updated May 20, 2026

Site work and new construction of a military facility in Hill Air Force Base, Utah. Completed plans call civil work for a military facility.

The requirement consists of installing a new Polyalphaolefin (PAO) chiller, pump, manifolds, distribution piping, controls, and instrumentation. The system will provide cooling for aircraft representative equipment. All questions or comments must be sent to by electronic mail to Zcheherah (Shar) Macapinlac at zcheherah.macapinlac@us.af.mil and Jonathan Graham at Jonathan.graham.11@us.af.mil, no later than (NLT) Monday, 04 May 2026 at 10:00 AM (MT).

Post-Bid

Military

$10,000,000.00

Public - Federal

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
151
Active Projects
72
Bidding Soon
1,204
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 11, 2026

July 10, 2026

Project location map

To Be Determined, Hill Air Force Base, UT

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed