BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 15, 2026 at 8:00 PM

Updated May 21, 2026

Demolition, site work and asbestos abatement for a mixed-use development in Kalama, Washington. Completed plans call for the demolition of a pre-engineered storage facility; for site work for a pre-engineered storage facility; for asbestos abatement for a pre-engineered storage facility; water / sewer project; water / sewer project; and water / sewer project.

For the Port of Kalama Chemtrade Site Demolition project. The Work includes the requirements for the removal, in whole or in part, and satisfactory disposal of items identified within these Specifications or on the drawings including, but not limited to, the following: A warehouse/manufacturing building containing office space, storage areas, loading docks, a utility room, and product manufacturing areas. The building is generally constructed with steel column and beam framing, sheet metal siding, and a concrete slab-on-grade foundation, and includes a concrete-lined subgrade tank vault with two former process tanks located inside the northern portion of the warehouse building. There are areas that abatement work will be needed to remove and dispose of Asbestos, Lead, and PSBs properly. A concrete secondary containment area, which contains chillers and tanks formerly used to store wastewater, glycol, and dissolver, located adjacent to the northwestern portion of the warehouse/manufacturing building. A process building that contains a zinc oxide dryer, a truck loading area, and three concrete secondary containment areas that contain process tanks and silos located on the north and northwest sides of the warehouse/manufacturing building. An above ground storage tank (AST) used to store sulfur dioxide located on the southeast portion of the site. Three compressed air ASTs located outside of and on the west side of the warehouse/manufacturing building. A concrete lined stormwater pond located in the central portion of the site A railroad spur that traverses the southeast boundary of the site. A river water pump house located on the southwestern portion of the site and decommission the well that the pump house serves. A septic system located on the northeast portion of the site. 10. A Parshall flume associated with a non-contact cooling water discharge outfall located on the northwest portion of the site. Miscellaneous concrete and steel structures (i.e. walls, bollards, elevated pads, guard rails, previously decommissioned groundwater monitoring/injection and extraction well monuments/well lids etc.) All contractors must comply with the prevailing wage and anti-discrimination laws of the State of Washington and pay all associated fees. Bids may NOT be withdrawn or canceled by the bidder for a period of sixty (60) days following the bid opening. For further information contact Darin Sampson, Project Manager, Port of Kalama, at (360) 673-2325 or dsampson@portofkalama.com. Question Deadline 05/08/2026 at 4:00 PM PT

Post-Bid

Warehouse / Distribution - Pre-Engineered Storage Building

$958,224.00

Public - Federal

Asbestos Abatement, Demolition, Site Work

16

8

15

4

Subscribe For Documents

37 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
195
Active Projects
108
Bidding Soon
1,463
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.