Published December 16, 2025 at 7:00 PM
Updated December 17, 2025
Demolition, site work and new construction of a bridge / tunnel in Kalama, Washington. Completed plans call for the demolition of a one-story above grade bridge / tunnel; for the construction of a bridge / tunnel; and for site work for a bridge / tunnel.
The work includes all labor, materials, tools, equipment, permits, testing, training, and supervision for the installation of all components of the Pedestrian Crossing Replacement project as shown in the plans and specifications. This generally includes preparing required submittals and attending required meetings with the Owner and regulatory agencies as required by permits, mobilizing to the site, implementing temporary site controls (including traffic controls, marine environmental/water quality controls, and temporary erosion and sediment controls), demolishing, clearing and grubbing the site, performing site grading for new civil, structural/architectural, landscaping, and utilities work, furnishing and installing new concrete and asphalt pavement surfaces, furnishing and installing a new contractor-designed pre-manufactured pedestrian bridge and stair/elevator towers, furnishing and installing new landscaping elements and irrigation system, furnishing and installing a new elevator system, furnishing and installing new lighting and electrical service, and demobilizing equipment, labor, temporary facilities and unused materials from the site. Other work required to complete the primary tasks identified above and described in the Contract Documents is also included. All contractors must comply with prevailing wage and apprenticeship utilization requirements, anti-discrimination laws of the State of Washington, and pay all associated fees. The Port of Kalama will comply with statutory retainage requirements for public works contracts. The Port of Kalama is an equal opportunity employer. Bid packets containing plans, specifications, and detailed instructions to bidders may be obtained as described in the notice. Bids may not be withdrawn or canceled by the bidder for a period of sixty (60) days following the bid opening. This contract includes an Apprentice Utilization Goal. No less than 15% of project Labor Hours shall be performed by Apprentices.
GC Bidding
Bridges / Tunnels
$12,000,000.00
Public - Federal
Demolition, New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 6, 2026
April 9, 2026
To be determined, Kalama, WA
Related To This Project
Kalama, WA
Bid Date: Sep 30 2025
Kalama, WA
Bid Date: Aug 20 2025
Kalama, WA
Bid Date: Jul 07 2025
Kalama, WA
Bid Date: May 12 2025
Kalama, WA
Bid Date: Apr 29 2025
Kalama, WA
Bid Date: May 12 2025
Kalama, WA
Bid Date: Apr 18 2025
Kalama, WA
Bid Date: Apr 15 2025
Kalama, WA
Bid Date: Apr 14 2025
Kalama, WA
Bid Date: Apr 08 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.