Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 9, 2026 at 8:00 PM
Updated May 14, 2026
Site work for a playground / park / athletic field in Salt Lake City, Utah. Completed plans call for site work for a playground / park / athletic field.
Expand the 100-yard range pit. Construction Cost Estimate: $299,000.00. Pre-qualification requirements: Only contractors who have been prequalified under a Stage I Prequalification for Contractors and are currently on the respective DFCM Prequalified Contractors list as of the date of this solicitation are eligible to bid on this project. Project Identification: Lee Kay 100-Yard Range Improvements Project (DFCM Project No. 26368520) 1. Project Location: a. The Project is located Lee Kay Shooting Range 6000 West 2100 South, Salt Lake City, Utah. More specifically shown in the project drawings. b. Staging areas at the jobsite will be provided, as noted on the project drawings. It will be the contractor’s responsibility to secure the staging area. WORK COVERED BY CONTRACT DOCUMENTS A. The following list has been furnished for the convenience of the Contractor and shall not be considered as representing all Work required in the Contract Documents. Contractor shall not take advantage of any errors or omissions in this listing and shall report any discrepancies or questionable items to the Engineer for clarification. The Work of Project is defined by the Contract Documents and consists of construction and installation of the following: 1. Mobilization 2. Construction Traffic Control 3. Erosion Control 4. Clear, Grub, and Grading for Improvements 5. Sawcut and Removal of Asphalt 6. Furnish and Install Concrete Footing and Walls 7. Furnish and Install Reinforced Concrete Slab 8. Furnish and Install 12-inch Diameter Pipe, Fittings, and Appurtenances 9. Furnish and Install 4-inch Diameter Perforated Pipe, Fittings, and Appurtenances 10. Furnish and Install Lift Pump 11. Furnish, Place, and Install Concrete on UTBC 12. Furnish, Place, and Compact UTBC 13. Permitting Coordination
Post-Bid
Playgrounds / Parks / Athletic Fields
$299,000.00
Public - State/Provincial
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 14, 2026
June 15, 2026
6000 2100 S, Salt Lake City, UT
Related To This Project
Salt Lake City, UT
Bid Date: May 21 2026
Salt Lake City, UT
Bid Date: May 21 2026
Salt Lake City, UT
Bid Date: May 06 2026
Salt Lake City, UT
Bid Date: May 14 2026
Salt Lake City, UT
Bid Date: May 19 2026
Salt Lake City, UT
Bid Date: Jun 18 2026
Salt Lake City, UT
Bid Date: May 21 2026
Salt Lake City, UT
Bid Date: May 21 2026
Salt Lake City, UT
Bid Date: May 22 2026
Salt Lake City, UT
Bid Date: May 21 2026
Salt Lake City, UT
Bid Date: May 22 2026
Salt Lake City, UT
Bid Date: May 29 2026
Salt Lake City, UT
Bid Date: May 22 2026
Salt Lake City, UT
Bid Date: May 14 2026
Salt Lake City, UT
Bid Date: May 22 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
