Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 25, 2026 at 8:00 PM

Updated October 6, 2026

Renovation of a military facility in Cherry Point, North Carolina. Completed plans call for the renovation of a military facility.

The Government requires the procurement of commercial electronic targetry components and associated onsite installation services to convert existing hardwired Stationary Infantry Targets and Stationary Armor Targets to a wireless configuration. The requirement includes Command and Control Boards for Stationary Infantry Targets and Stationary Armor Targets, Wire and Antenna Kits, and RF Modules, along with all labor necessary to install, integrate, test, and make the components fully operational within the existing range infrastructure. The conversion from hardwired to wireless systems is required to improve range reliability, reduce recurring maintenance issues associated with degraded physical wiring, and ensure uninterrupted live-fire training and range operations in support of military personnel. There are no option periods or options to extend services associated with this requirement. This procurement is restricted to General MACC contractors, and only the contractors identified on the RFP cover letter are authorized to submit proposals. The scope of work and applicable drawings are provided in the attached documents. This solicitation incorporates Amendment 0001, Amendment 0002, and Amendment 0003. Location: Fort Riley, Kansas 66442

Award

Military

$10,000,000.00

Public - Federal

Renovation

18

21

12

2

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
108
Active Projects
53
Bidding Soon
747
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 1, 2026

October 28, 2026

Project location map

To Be Determined, Cherry Point, NC

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed