BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 9, 2026 at 8:00 PM

Updated June 10, 2026

Site work and paving for a mixed-use development in Seeley Lake, Montana. Completed plans call for site work for a military facility; road / highway; for paving for a road / highway; and water / sewer project.

Lolo National Forest Alva Lake Campground improvements. The Campground is approximately 60 miles north of Missoula, MT along highway 83. This project replaces the existing water system, electrical system, and re-paves a loop of the Lake Alva Campground. The magnitude of the project is between 500,000 and 1,000,000. Questions shall be submitted via email to john.curry@usda.gov and are due no later than May 15 2026.

Post-Bid

Military

$1,000,000.00

Public - Federal

Paving, Site Work

42

10

2

4

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
28
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 8, 2026

July 15, 2027

Project location map

To Be Determined, Seeley Lake, MT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.