BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 31, 2026 at 8:00 PM

Updated August 2, 2026

Site work and paving for a mixed-use development in Seeley Lake, Montana. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The Seeley Lake - N & S project is located in Missoula County, north and south of the Town of Seeley Lake on Montana Highway 83 (P-83), from accumulated mileage (AM) 0.006 to 4.846 (South Section), and from AM 13.127 to 31.562 (north section). The middle section from AM 4.846 to 13.127 is not included in this contract. Mastic crack filling and crack sealing (outside the mill/fill and digout areas) full project length. Full depth replacement of asphalt and base course from 4.165 - 4.205 Full Width Cold milling and asphalt overlay from AM 1.000 to AM 1.166, AM 2.000 to AM 3.000, and AM 3.500 to AM 4.000. Full width seal and cover, and fog seal full project length. New pavement markings throughout. Sinusoidal centerline rumble strips (only across mill/fill and digout areas). Fog Seal on the shared use path at two locations. This project is under the jurisdiction of the Missoula District Administrator. Uniform No. 10687000 MT DOT - 204 - Seeley Lake - N & S

GC Bidding

$2,000,000.00

Public - State/Provincial

Our team is requesting plans for this project.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
26
Active Projects
11
Bidding Soon
209
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 27, 2026

October 26, 2026

Project location map

MT-83, Seeley Lake, MT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.