BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 31, 2026 at 8:00 PM

Updated August 5, 2026

Site work for a mixed-use development in Big Timber, Montana. Completed plans call for site work for a water / sewer project; and playground / park / athletic field.

The Greycliff Rest Area Rehab project consists of the design and implementation of potable water and wastewater system improvements for the MDT Greycliff Eastbound and Westbound Rest Area facilities on each side of I-90 near RP 381.0. The project will address capacity, reliability, water quality, and regulatory compliance. Work includes reconfiguring the public water system to serve both facilities from a newly constructed and DEQ-approved public water supply well at the Westbound Rest Area; abandoning the existing Eastbound well; installing a new 5,000-gallon buried potable water storage tank; providing new water service piping between buildings; and installing redundant distribution pumps, controls, valves, and appurtenances necessary to meet projected maximum day and peak instantaneous demands in accordance with DEQ Circular DEQ-3. The project also includes replacement of the existing undersized on-site wastewater system with a new advanced Level 2 treatment system, including new septic tanks, an equalization tank, a dosing tank, effluent pumps, force mains, and a multi-zone pressure-dosed drainfield. This project is located in Sweetgrass County. This project is under the jurisdiction of the Billings District Administrator. Uniform No. 10095000 MT DOT - 205 - Greycliff Rest Area Rehabiltation

GC Bidding

$5,000,000.00

Public - State/Provincial

Our team is requesting plans for this project.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
21
Active Projects
8
Bidding Soon
168
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 27, 2026

October 26, 2026

Project location map

Multiple Locations, Big Timber, MT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.