Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 4, 2026 at 8:00 PM
Updated May 16, 2026
Renovation of a military facility in Fairbanks, Alaska. Working plans call for the renovation of a military facility.
Work consists of a design-build construction effort to perform life safety repairs and electrical upgrades at an existing hangar facility. The project includes installing new electrical power on the southeast side of Hangar 1 to support the Black Hawk Aircrew Trainer and the Transportable Flight Procedure Simulator, including dedicated ECU units. Electrical scope includes providing two 120/208V, 200-amp, 60Hz, three-phase, four-wire plus ground services for each device with required military-spec receptacles. The work also includes connecting the simulators to the existing fire alarm system, converting bay areas to a wet-pipe sprinkler system, correcting egress deficiencies, and completing additional life safety upgrades such as code-required egress and emergency lighting. The project further requires installation of expanded metal mesh within a prefabricated arms vault to achieve compliance with AR 190-11 requirements for use as an Arms Room. Updates to the existing fire protection system may be required to meet current building codes. The facility is designated as a historic building, and coordination with the State Historic Preservation Office is required to ensure compliance with all applicable laws and regulations. The project will be executed as a total small business set-aside using lowest price technically acceptable source selection procedures, with a construction cost limitation of $21,000,000 and an anticipated performance period of approximately 600 calendar days. The construction cost limitation for this requirement is $21,000,000. The performance period will be approximately 600 calendar days. The Method of Contractor Selection has not been determined at this Time.
Final Planning
Military
$21,000,000.00
Public - Federal
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 30, 2026
To Be Determined, Fairbanks, AK
Related To This Project
Fairbanks, AK
Bid Date: May 22 2026
Fairbanks, AK
Bid Date: May 14 2026
Fairbanks, AK
Bid Date: May 14 2026
Fairbanks, AK
Bid Date: May 07 2026
Fairbanks, AK
Bid Date: May 11 2026
Fairbanks, AK
Bid Date: May 12 2026
Fairbanks, AK
Bid Date: May 13 2026
Fairbanks, AK
Bid Date: May 13 2026
Fairbanks, AK
Bid Date: Mar 03 2026
Fairbanks, AK
Bid Date: Feb 27 2026
Fairbanks, AK
Bid Date: Mar 24 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
