Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published April 30, 2026 at 8:00 PM
Updated May 16, 2026
This is a service / maintenance or supply contract in Danville, Kentucky. Contact the soliciting agency for additional information.
o Contract is from July 1, 2026 to June 30,2026 of the 2026-2027 school year. The contract can be renewed for up to an additional 2 years before having to be rebid. o Mowing for all 2 facilities yards is expected to start when grass begins to grow - from the first/middle of March to April, whichever occurs first. Mowing is expected to continue until grass stops growing - until late October or first of November. 35 weeks possible. o Yards are expected to look acceptable though-out the mowing season. With certain weather conditions regarding drought or fast growing grass, mowing may be needed more or less based on the conditions of the yards. It is expected for you to monitor each yard in order to meet these expectations. o Facilities can be mowed during the day, however be mindful of students. When state testing is taking place no mowing during the 8am-3:30pm. State testing in the spring. o At a minimum, yards are to be mowed a minimum of one time each week and mowed more or less based on growing conditions. o Grass should not be allowed to be so tall that after mowing the grass clippings are "clumped" as this gives an unsuitable appearance. If this is the case in an extreme rainy season, it is expected to mow back over ground in order to spread clippings across yard. o Each mowing event shall include weed-eating all areas of schools to include but not limited to: around school buildings, all sidewalks, other buildings on grounds, signs, school marquee , fenced area ( noted with DOP) , trees, curbs, steps, etc. o Twice a month mulch beds should be checked for weeds and removed if visible o Shrubbery should be trimmed as needed (minimum 2 times a year(1 before school starts) o Mulch spread 1 week before school starts in the fall. Landscape beds and front trees need to be mulched (Black Mulch) to make the school look presentable. o Removal of trash on grounds, when mowing. o Each mowing event shall include removal of grass from sidewalks, steps, roads and/or parking lots. This can be completed by a leaf blower, broom, etc. It does not have to be removed from grounds. Contract Start Date: July 1, 2026 - June 30, 2027 Boyle County Schools reserves the right to reject any and all bids. o Please contact Bobby Leffew at bobby.leffew@Boyle.kyschools.us or 859-236- 6634 for site location information including maps of lawn areas.
Post-Bid
Educational
Public - County
Service, Maintenance and Supply
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
