BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 30, 2026 at 8:00 PM

Updated May 20, 2026

This is a service / maintenance or supply contract in Winnipeg, Manitoba. Contact the soliciting agency for additional information.

The Work consists of Asphalt Mill and Fill on specified sections of Plessis Road and Grant Avenue, and Asphalt Paving of Granular Shoulder Reconstruction on sections of Lagimodiere Boulevard. Major components for Asphalt Mill and Fill include asphalt pavement milling (average thickness 50mm), renewal and patching of existing concrete joints, placement of pavement repair fabric, renewal of sidewalk, curbs, splash strips, and median slabs as required, placement of asphalt overlay (average thickness 50mm), reflective crack maintenance, and boulevard restoration as required. Asphalt Paving of Granular Shoulder Reconstruction involves excavation, placement of separation of geotextile fabric, placement of base course and subbase, renewal of existing curb as required, minor pavement repairs adjacent to roadway shoulder as required, inlet adjustment as required, placement of asphalt pavement, and boulevard restoration. Bids must be submitted online. Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.

Post-Bid

Roads / Highways

$2,000,000.00

Public - City

Service, Maintenance and Supply

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
147
Active Projects
79
Bidding Soon
694
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 20, 2026

July 4, 2026

Project location map

185 King Street, Winnipeg, MB

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.