BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 12, 2026 at 8:00 PM

Updated May 15, 2026

Renovation of a playground / park / athletic field in Pomona, California. Completed plans call for the renovation of a playground / park / athletic field.

The City of Pomona is seeking quotes from qualified contractors to perform rehabilitation construction for the Westmont Park Restrooms at 1808 W. Ninth St. Pomona CA, 91767. Online Q&A Online Q&A Yes Q&A Deadline 05/13/2026 3:00 PM (PDT) Remove two gates. Repair all necessary framing and stucco as needed. 2. Install 2 new doors and frames in the place of the gates. All new doors to include all necessary door hardware, handles, locks, that meet all current ADA standards. Restroom doors to be keyed alike. Basis of Design includes hollow metal doors and frames with continuous hinges, closers, weatherstripping, thresholds, vandal resistant trim, deadbolt and Schlage commercial grade levers/locksets, or equals. 3. Include two separate add alternates to relocate each door to the south side of the building, to include framing and stuccoing old location to match existing exterior. 4. Include add alternates to remove any partial walls inside the restrooms that are not load bearing to open the space to meet all current ADA standards. 5. Remove, and dispose of all fixtures inside of the restrooms. 6. Media blast all interior surfaces to remove old paint. Approximately 625 ft2 7. Clean and prep all surfaces for new paint. 8. Paint walls and ceilings in colors to be determined by the city of Pomona. 9. Bid in two separate line item for the repair of the tile floor and tiled cove base, and one for the removal of the tile floor and tile cove base. Approximately 90 ft2. 10. Prep the floor for epoxy coating. 11. Epoxy coat the floor using PPG FLOORING 618 EPOXY COATING. 12. All measurements to be verified by contractor, including all ADA standards. 13. Replace all fixtures with stainless steel fixtures. i.e. toilets and sinks, lights, any ventilation grates, and all ADA accessories, such as grab bars. All fixtures shall be vandal-resistant and suitable for public use facilities. 14. Contractor must possess current City of Pomona business license if awarded project, as well as proof of insurance. 15. This project is to be bid prevailing wage. 16. Contractor must attend Mandatory job walk to bid on this project. Question Deadline 05/13/2026 at 3:00 PM PT All questions related to this solicitation must be submitted through online portal.

GC Bidding

Playgrounds / Parks / Athletic Fields

$300,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

50 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
478
Active Projects
211
Bidding Soon
2,319
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 26, 2026

June 25, 2026

Project location map

1808 W 9th St, Pomona, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.