Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 6, 2026 at 8:00 PM
Updated May 16, 2026
Site work for a mixed-use development in Redondo Beach, California. Completed plans call for site work for a playground / park / athletic field; and water / sewer project.
The work comprises, without limitation, furnishing all necessary labor, materials, equipment, and other incidental and appurtenant work necessary to install infiltration systems, including drywells, hydrodynamic separators, and check valves as called out in the plans, HDPE pipe, diversion structures, trench drains, and other associated work for the Fulton Playfield Multi-Benefit Infiltration Project. The project will involve modifying the existing weir chamber and flood control basin, construction of a hydrodynamic separator, drywells and connecting storm drain infrastructure, and installation of an inlet check valve. Bioretention features to capture additional runoff and parkway landscaping will also be constructed along Rindge and Earle Ln. All temporary utility services for light, power, sanitary facilities, and water for the duration of the project, and their removal at project conclusion, are also required. The contractor must provide a 24-hour emergency contact for removal, installation, relocation, and maintenance of warning devices. All required permits, insurance, bonds, and certifications must be obtained by the contractor. Mobilization includes site review, all preparations, and temporary facilities needed for the work. The City reserves the right to adjust unit quantities and scope of work as necessary to meet project and budgetary requirements. Contractors must have an active Class "A" license, a minimum of 5 years of applicable experience, and 5 recently completed similar public works projects at the time of submitting the bid. The project must be completed and ready for service within 120 working days after the Notice to Proceed is issued. All work is subject to compliance monitoring and enforcement by the Department of Industrial Relations, and prevailing wage requirements apply. Proposals must be submitted electronically using the City's procurement portal. All documents and required information, including bid bond and subcontractor list, must be complete and in accordance with requirements. Questions about documents or specifications must be submitted through the portal at least ten working days prior to bid opening. Bids will be publicly opened electronically. Payment at the agreed prices will be in full for completed work and will cover materials, supplies, labor, tools, equipment, and all other expenditures incident to satisfactory compliance with the contract. The City may reject any or all proposals and will award the contract to the lowest responsible bidder meeting all requirements. Substitutions of specified products require written request at least ten working days before bid date and approval via addendum. Question Deadline 05/14/2026 At 5PM Questions regarding documents, discrepancies, omissions, or intent of specifications or drawings, shall be submitted through the Citys OpenGov portal, in writing, at least ten (10) working days prior to opening of bids. Questions will be received by the project manager, Ashwini Bhide.
GC Bidding
Water / Sewer
$6,600,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 28, 2026
July 27, 2026
529 Earle Ln, Redondo Beach, CA
Related To This Project
Redondo Beach, CA
Bid Date: Apr 09 2026
Redondo Beach, CA
--
Redondo Beach, CA
Bid Date: Mar 24 2026
Redondo Beach, CA
Bid Date: Feb 03 2026
Redondo Beach, CA
--
Redondo Beach, CA
Bid Date: Dec 04 2025
Redondo Beach, CA
Bid Date: Nov 05 2025
Redondo Beach, CA
Bid Date: Nov 04 2025
Redondo Beach, CA
--
Redondo Beach, CA
--
Redondo Beach, CA
Bid Date: Aug 07 2025
Redondo Beach, CA
Bid Date: Aug 08 2025
Redondo Beach, CA
Bid Date: May 28 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
