BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 4, 2026 at 8:00 PM

Updated May 20, 2026

Site work for a road / highway in Eastmain, Quebec. Conceptual plans call for site work for a road / highway.

Component 1 – Five-Year Asset Maintenance Program 2026-2035 A- Develop a five-year asset maintenance program for Billy-Diamond Road and Chisasibi Road. This program identifies, but is not limited to, 18 complex culvert sites and 14 km of roadway. B- Develop a rehabilitation and/or reconstruction program for the buildings and equipment of the SDBJ service centres located at km 135, km 257, km 507, and km 600 of Billy-Diamond Road. Component 2 – Design and Support A- Conduct design studies and prepare plans and specifications for culvert, structural culvert, roadway, and guardrail rehabilitation work, as well as other related activities. B-Conduct design studies and prepare plans and specifications for the rehabilitation and/or reconstruction work of the buildings and equipment of the SDBJ service centers, as well as for any related activity. TIMELINE: Request for proposals for engineering services to complete design and conduct construction surveillance is underway. Reference # 20134021. Deadline for submission of complaints: 2026-05-14.

Conceptual

Roads / Highways

$15,000,000.00

Public - State/Provincial

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1
Active Projects
1
Bidding Soon
7
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 7, 2027

Project location map

Rte Billy-Diamond, Eastmain, QC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.