Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 2, 2026 at 8:00 PM

Updated May 19, 2026

This is a service / maintenance or supply contract in New Madrid, Missouri. Contact the soliciting agency for additional information.

The County Commission of New Madrid County, Missouri is accepting bids for a two-phase project at #2 Courthouse Square and 350 US Highway 61, New Madrid, Missouri. Phase One requires labor to disconnect the existing transfer switch and power generator (100 kW, 208 Volt, three-phase unit) at #2 Courthouse Square. This includes coordinating with a local propane supplier to drain the 1,000-gallon tank, with Liberty Utilities to safely disconnect natural gas lines, and with the City of New Madrid to reconnect the building to the power supply after the generator is disconnected. The physical relocation of the generator will be managed by the County Highway Department after Phase One. Phase Two requires labor and materials to connect the transfer switch and generator at 350 US Highway 61 on a pre-poured concrete pad. Bidders may submit multiple bids for this phase, noting price differences between using copper or aluminum electrical wiring. The natural gas piping may require a separate gas meter and regulator(s). Coordination with Liberty Utilities is required for reconnecting gas lines, and with the City of New Madrid to properly interconnect the power supply and generator. Sealed bids must be submitted to the New Madrid County Commission by the stated deadline.

Post-Bid

Municipal

$40,000.00

Public - County

Service, Maintenance and Supply

Our team is requesting plans for this project.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
81
Active Projects
41
Bidding Soon
527
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 14, 2026

June 28, 2026

Project location map

To be determined, New Madrid, MO

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed