Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 8, 2026 at 8:00 PM
Updated May 14, 2026
Site work for a water / sewer project in Montreal, Quebec. Completed plans call for site work for a water / sewer project.
Reference number: 20143007 Deadline for receipt of complaints 2026-05-11 There is provision for a tendering process for each tender No Electronic tender submission accepted Yes, via SEAO, with a document Expected duration of the contract without options (in months) 6 Description The PUBLIC BODY wishes to issue a call for tenders for the replacement of circulation pumps and cleaning of the cooling system at Mackay School .1 Week 1 (25 June 2026 to 2 July 2026) .1 Transfer of the temporary chiller hire contract to the contractor .2 Initial cleaning of the chilled water system .3 Cleaning of the heating system .2 Weeks 2 to 3 (2 July 2026 to 17 July 2026) - Ground floor, Zone A .1 Inspection of the condition of the pipework and rectifications .2 Inspection of the compliance of supports and hangers and rectifications .3 Replacement of circulator duplexes .3 Weeks 4 to 5 (20 July 2026 to 31 July 2026) .1 2026 construction holiday .4 Weeks 6 to 7 (3 August 2026 to 14 August 2026) - Ground floor, zone B .1 Inspection of piping condition and rectifications .2 Checking the compliance of supports and hangers and making corrections .3 Replacement of circulator duplexes .5 Weeks 8 to 9 (17 August 2026 to 28 August 2026) - First floor, zone A .1 Checking the condition of the pipework and making corrections .2 Checking the compliance of supports and hangers and making corrections .3 Replacement of circulator duplexes .6 Weeks 10 to 11 (31 August 2026 to 4 September 2026) - Floor, Zone B .1 Checking the condition of the pipework and making corrections .2 Checking the compliance of supports and hangers and making corrections .3 Replacement of circulator duplexes .7 Week 12 (8 September 2026 to 11 September 2026) .1 Completion of works .2 Second cleaning of the chilled water system
GC Bidding
Water / Sewer
$200,000.00
Public - State/Provincial
Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 21, 2026
September 8, 2026
6333 Rue de Terrebonne, Montreal, QC
Related To This Project
Montreal, QC
Bid Date: May 21 2026
Montreal, QC
Bid Date: Jun 09 2026
Montreal, QC
Bid Date: Jun 03 2026
Montreal, QC
Bid Date: May 20 2026
Montreal, QC
Bid Date: Jun 04 2026
Montreal, QC
Bid Date: May 27 2026
Montreal, QC
Bid Date: May 22 2026
Montreal, QC
Bid Date: May 20 2026
Montreal, QC
Bid Date: May 19 2026
Montreal, QC
Bid Date: May 21 2026
Montreal, QC
Bid Date: Jun 02 2026
Montreal, QC
Bid Date: Jun 11 2026
Montreal, QC
Bid Date: Jun 04 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
