Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 13, 2026 at 8:00 PM
Updated May 16, 2026
Renovation of a fire / police facility in Warrenton, Missouri. Completed plans call for the renovation of a fire / police facility.
Install a high-performance epoxy flooring system at Fire Station 2, located at 26625 S. State Highway 47, Warrenton, Missouri 63383. The project includes surface preparation and installation of a durable, slip-resistant epoxy flooring system designed for heavy traffic, chemical resistance, and long-term durability, while maintaining fire station operations. Exterior Entry and Security Door Replacement project at Fire Station 2, located at 26625 S. State Highway 47, Warrenton, Missouri 63383. The project includes removal and replacement of exterior entry and security doors (excluding apparatus bay doors), frames, hardware, door closers, and related components, while maintaining continuous fire station operations. Plumbing System Upgrades at Fire Station 2, located at 26625 S. State Highway 47, Warrenton, Missouri 63383. The project includes plumbing repairs and improvements such as fixture replacements, shower and flush valve replacements, piping improvements, and related work necessary to maintain reliable, code-compliant operations in an active fire station. Missouri Prevailing Wage Applies. Information Technology (IT) Services supporting fire suppression, EMS, emergency response, and administrative operations. Services include managed IT services, network and infrastructure management, cybersecurity, Mobile Data Terminal (MDT) and Records Management System (RMS) support, Microsoft 365 administration, and strategic IT planning. The Warrenton Fire Protection District reserves the right to reject any or all proposals, waive informalities, request additional information, negotiate with proposers, or cancel the RFP if deemed in the best interest of the District. Approximate flooring area : Total Square Footage : 1,189 Existing Surface : Epoxy Areas Included : Dispatch room- 360 sqft Hallways- 207 sqft Storage rooms- 60 sqft Restrooms- 20 sqft Kitchen- 360 sqft Contractoris responsiblefor verifying all field dimensions
Post-Bid
Fire / Police
$200,000.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 14, 2026
June 15, 2026
26625 State Hwy 47, Warrenton, MO
Related To This Project
Warrenton, MO
--
Warrenton, MO
Bid Date: Jun 04 2026
Warrenton, MO
Bid Date: May 14 2026
Warrenton, MO
Bid Date: May 14 2026
Warrenton, MO
Bid Date: Jun 11 2026
Warrenton, MO
Bid Date: Apr 30 2026
Warrenton, MO
Bid Date: Apr 30 2026
Warrenton, MO
Bid Date: May 05 2026
Warrenton, MO
Bid Date: Mar 17 2026
Warrenton, MO
Bid Date: Mar 17 2026
Warrenton, MO
Bid Date: Mar 17 2026
Warrenton, MO
Bid Date: Mar 10 2026
Warrenton, MO
Bid Date: Mar 10 2026
Warrenton, MO
Bid Date: Mar 10 2026
Warrenton, MO
Bid Date: Mar 10 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
