BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 6, 2026 at 8:00 PM

Updated May 16, 2026

This is a service / maintenance or supply contract in Kansas City, Missouri. Contact the soliciting agency for additional information.

MARC is seeking an experienced consultant to develop a regional transportation vulnerability and resiliency plan tailored to the Kansas City region. The purpose of the plan is to create a set of analytical tools, criteria, and decision-making supports to substantially increase the ability of the community and the multimodal transportation system to withstand, recover and bounce forward from disruptive events such as flooding, drought, and extreme heat. The framework will protect long-term investments by federal, state, and local government in transportation infrastructure. The framework also will identify how existing transportation infrastructure contributes to regional risks and vulnerabilities, such as urban heat islands and flooding, and develop appropriate mitigation strategies. The subject RFP is intended to complete the second phase of a two-part planning process. The work will build from a phase one report consisting of a summary of public outreach, including steering committee and focus group meetings, a proposed narrative for future grant funding, a proposed screening and project prioritization matrix, and a tiered framework strategy for a future resilience improvement plan. To complete the second phase of the plan, an inventory of existing assets and hazard identification will be completed to create a comprehensive catalog of transportation infrastructure (roads, bridges, transit systems, etc.) and identify key natural hazards (extreme heat, drought, flooding, extreme winter weather, etc.) and match them with assets at highest risk. The asset inventory, combined with a criticality determination and risk assessment, will be analyzed to produce a profile of regional risk, including economic, operational, and social consequences. Insights from the assessment will be translated into actionable recommendations for infrastructure upgrades, emergency preparedness, and long-term resilience strategies which will be integrated into existing planning tools such as the Transportation Improvement Program and ConnectedKC 2050. The method of Contractor Selection has not been Determined at this time. "Requests for proposals for design services is underway."

Conceptual

Roads / Highways

Public - State/Provincial

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
152
Active Projects
53
Bidding Soon
921
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 30, 2026

Project location map

Multiple Locations, Kansas City, MO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.