BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 14, 2026 at 8:00 PM

Updated May 14, 2026

Site work and paving for a road / highway in Tulsa, Oklahoma. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The Contract stipulations, which follow, are general in scope and may refer to conditions that will not be encountered in the performance of the work included in this Contract, and which are not applicable thereto. Any requirements, provisions, or other stipulations of these General Conditions, which pertain to a nonexistent condition, and are not applicable to the work to be performed hereunder, shall have no meaning in the Contract. The specifications and drawings are intended to supplement, but not necessarily duplicate each other. Together they constitute one (1) complete set of specifications and drawings, so that any work exhibited in the one and not in the other shall be executed just as if it had been set forth in both, in order that the work shall be completed according to the complete design or designs as decided and determined by the Engineer. Should anything be omitted from the specifications and drawings which is necessary to a clear understanding of the work, or should it appear various instructions are in conflict, then the Contractor shall request written clarification from the Engineer before proceeding with the construction affected by such omissions or discrepancies. The overall aspirational Small Business Enterprise utilization goal for this project is ten (10) percent. Question Deadline 05/28/2026 at 5:00 PM CT Questionnaires are included in the bid documents, each bidder shall submit the Questionnaire directly to the Engineer on the first working day following the bid opening. Project No. TMUA-W22-53, 200961-00 For furnishing all tools, materials, and labor and for performing all work necessary for the construction of the following project: Arterial street rehabilitation pine street from garnett road to 129th east avenue Contract requirements shall include compliance with all laws pertaining to nondiscrimination in employment. The overall aspirational Small Business Enterprise (SBE) utilization goal for this project is ten percent (10%). A Certified or Cashier's Check, or a Bidder's Surety Bond, in the amount of five percent (5%) of the bid amount, is required from each bidder. This security shall be retained as liquidated damages if the successful bidder fails, neglects, or refuses to enter into the contract and furnish the required bonds within thirty (30) days after award. The successful bidder will be required to maintain public liability and workers' compensation insurance, and to furnish Performance, Statutory, and Maintenance Bonds acceptable to the City of Tulsa, each in the amount of one hundred percent (100%) of the contract price, in accordance with the contract documents.

GC Bidding

Roads / Highways

$300,000.00

Public - City

Paving, Site Work

48

4

4

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
94
Active Projects
42
Bidding Soon
659
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 29, 2026

June 29, 2026

Project location map

Multiple Locations, Tulsa, OK

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.