BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 12, 2026 at 8:00 PM

Updated May 14, 2026

Site work and new construction of a detention facility in Wetumpka, Alabama. Completed plans call for the construction of a detention facility; and for site work for a detention facility.

SummaryProject Description: The Project consists of the construction of a new county jail facility on the site immediately adjacent to the existing county jail. The project will be built in multiple phases under a single contract. The existing jail facility will remain in operation during the construction until the completion and occupancy of the new facility. The new building will consist of two phases. Phase 1 includes the new administrative and support functions for the operation of the facility including offices, food service, booking/intake facilities with enclosed sallyport, laundry, inmate property storage, classrooms, staff support areas and a medical unit. Additionally, Phase 1 will include housing units for 240 beds consisting of 4 traditional cell blocks (30-beds each) with two-person cells, and 4 dormitory style blocks (30 beds each). Supervision of the housing units is provided in two control rooms located at a mezzanine level and connected by a corridor with each control room having visibility into 4 housing units. Phase 2 consists of Part A (Base Bid) of a housing pod for 120 beds and Alternate #1 if accepted for an additional 120 beds. The Phase two housing pod is similar in design to the Phase 1 housing pod. Upon the completion of Phase 1 and Phase 2, Phase 3 (Alternate #2) will consist of the demolition of the existing jail facility and sealing of the existing security tunnel that connects the existing jail facility to the adjacent Judicial Complex. The existing facility will be demolished including removal of the foundations and the removal and capping of the existing utilities. The security tunnel, once sealed at each end, will be fully grouted. Contract Scope: Construction, demolition, and facility occupancy and operation during construction operations . Contract Terms: Lump sum (fixed price, stipulated sum) Theexisting facilities and site are available for examination by bidders by appointment only. Contact the Owner or Architect to schedule a time to visit the project site.

GC Bidding

Jails / Prisons

$70,000,000.00

Public - County

New Construction, Site Work

497

32

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 2, 2026

August 3, 2026

Project location map

8935 US-231, Wetumpka, AL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.