Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 4, 2026 at 8:00 PM
Updated May 21, 2026
This is a service / maintenance or supply contract in Poplar Grove, Illinois. Contact the soliciting agency for additional information.
The Complexity Factor for this project is 0. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on July 28, 2026, at 9:00 AM at the Region Two/District Two Office in Dixon. Phase III engineering services are required for the reconstruction of structures carrying US20 over I-90, 0.4 mile west of Wheeler Road to 0.1 mile east of Ipsen Road in Boone County. Construction contract 64P60 includes reconstruction of US20 roadway and relocation of Wheeler Road and Ipsen Road, guardrail, retaining wall, drainage improvements, traffic signal improvements, and landscaping. The following structures are included in this project: o S.N. 004-9900: WB US20 over I-90. o S.N. 004-0004: EB US20 over I-90. The Prime firm must be prequalified in the Special Services (Construction Inspection) category to be considered for this project. Statements of Interest, including resumes of only the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). The method of contractor selection has not been determined at this time. ILDOT - 28 - RFQ - Reconstruction of Structures US20 over I-90, Phase III Project
Conceptual
Bridges / Tunnels
Public - State/Provincial
Service, Maintenance and Supply
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 23, 2026
U.S. 20 bus, Poplar Grove, IL
Related To This Project
Poplar Grove, IL
Bid Date: May 05 2026
Poplar Grove, IL
Bid Date: Mar 30 2026
Poplar Grove, IL
Bid Date: Feb 09 2026
Poplar Grove, IL
--
Poplar Grove, IL
Bid Date: Sep 15 2021
Poplar Grove, IL
Bid Date: Aug 20 2025
Poplar Grove, IL
Bid Date: May 06 2025
Poplar Grove, IL
Bid Date: Mar 07 2025
Poplar Grove, IL
Bid Date: Mar 07 2025
Poplar Grove, IL
--
Poplar Grove, IL
Bid Date: Sep 27 2024
Poplar Grove, IL
Bid Date: May 13 2024
Poplar Grove, IL
Bid Date: Apr 25 2024
Poplar Grove, IL
Bid Date: Apr 25 2024
Poplar Grove, IL
Bid Date: Mar 08 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
