BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 5, 2026 at 8:00 PM

Updated May 16, 2026

Site work for a water / sewer project in Charleston, South Carolina. Conceptual plans call for site work for a water / sewer project.

Market research is being conducted to identify qualified and interested businesses capable of performing heavy and civil construction work associated with upcoming phases of the Charleston Peninsula Coastal Storm Risk Management project. The work represents initial segments of a larger coastal flood protection effort and includes construction activities associated with complex urban waterfront infrastructure. One segment involves the Adger's Wharf area, extending from South Adger's Wharf to the southern end of Waterfront Park and encompassing approximately 1,200 linear feet of seawall and pedestrian promenade in a historically significant and technically complex setting. Anticipated construction activities include seawall construction and associated promenade features, with delivery potentially through a design-build or collaborative construction approach. Another segment involves the Lockwood Drive area, one of the lowest elevation and most vulnerable portions of the peninsula, extending approximately 7,820 linear feet from the Ashley River Bridges south to the U.S. Coast Guard Station at Tradd Street. This work is expected to incorporate tide gates, ADA-compliant connections, pedestrian ramps, public promenade features, and nature-based shoreline enhancements, while coordinating with adjacent City of Charleston infrastructure initiatives. Construction for these segments is anticipated to involve traditional heavy and civil engineering methods and coordination within an active urban environment. Construction rough order of magnitude costs are expected to be between $15M and $30M. Location: Charleston Peninsula, Charleston, South Carolina. The Method of Contractor Selection has not been determined at this Time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Conceptual

Water / Sewer

$30,000,000.00

Public - Federal

Site Work

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
130
Active Projects
49
Bidding Soon
594
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 28, 2027

Project location map

Multiple Locations, Charleston, SC


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.