BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 4, 2026 at 8:00 PM

Updated May 20, 2026

This is a service / maintenance or supply contract in Springfield, Illinois. Contact the soliciting agency for additional information.

The Complexity Factor for this project is 0.035. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on July 30, 2026, at 11:00 AM at the Bureau of Operations Office in Springfield. Phase II engineering services are required to provide evaluation of traffic signals and systems, coordinate traffic signal systems in a corridor to minimize delay and stops, develop and implement optimum signal timings in the field at locations within Districts 2-5, and develop and conduct traffic signal trainings. The Consultant's work is anticipated to include accomplishment of one or more of the following tasks for locations to be determined: Data Collection: Field, or otherwise approved method, collection of traffic counts, turning movements, signal phasing, signal timings, equipment inventory, and other data needed to qualify existing operating conditions and determine signal functions and traffic needs. Data Analysis: Develop computer models with SYNCHRO and SIMTRAFFIC, or other software only with prior written approval. Recommendations for optimal signal operation plans shall be generated utilizing the existing signal equipment and with minor recommended equipment enhancements. Engineering judgement shall be used to select the final plans recommended for implementation. Implementation: The approved signal optimizations shall be placed in operation and any necessary fine-tuning adjustments shall be made. The method of Contractor Selection has not been Determined at this time. ILDOT - 57 - RFQ - Various Phase II Traffic Signal Study *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Conceptual

Roads / Highways

$300,000.00

Public - State/Provincial

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 23, 2026

Project location map

Multiple Locations, Springfield, IL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.