BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 14, 2026 at 8:00 PM

Updated May 15, 2026

Site work and paving for a road / highway in Monticello, Florida. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Question Deadline 05/22/2026 at 5:00 PM ET All inquiries and questions concerning this ITB, must be in writing (e-mail is acceptable), received in accordance with Section 1.0 Schedule of Events, and must be directed to Jenny Tuten, Executive Assistant jtuten@jeffersoncountyfl.gov or mailed to 450 W Walnut St., Monticello, FL 32344. This project is for the construction services for widening and resurfacing and widening of CR 149 Boston Highway from SR 57 (US 319) FL/GA Parkway to Still Road. The scope will include (2) 12' travel lanes and 3' paved shoulders. Drainage improvements will include evaluating all driveway side drain pipes and miter-end sections due to their condition and to keep drainage connectivity, as needed. Signage exists within the project limits and will be evaluated to determine the need for additional signs, correcting redundant or conflicting signage and the replacement of existing signage, as needed. New thermoplastic striping and RPM's will also be included in the project. All work will be completed within existing right of way. This project is for the construction services of the widening and resurfacing of CR 149 Boston Highway from Still Road to Giley Road. This project will include widening and resurfacing the roadway to two 12' travel lanes with 3' paved shoulders. Drainage improvements will include driveway side drain pipes and miter-end sections. Signage, thermoplastic striping and RPM's will be included in the project. All work will be completed within the existing right of way.

GC Bidding

Roads / Highways

$500,000.00

Public - County

Paving, Site Work

231

6

2

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
87
Active Projects
33
Bidding Soon
356
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 5, 2026

July 6, 2026

Project location map

Boston Hwy (CR 149), Monticello, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.