Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 14, 2026 at 8:00 PM
Updated May 15, 2026
Site work and paving for a road / highway in Monticello, Florida. Completed plans call for site work for a road / highway; and for paving for a road / highway.
Question Deadline 05/22/2026 at 5:00 PM ET All inquiries and questions concerning this ITB, must be in writing (e-mail is acceptable), received in accordance with Section 1.0 Schedule of Events, and must be directed to Jenny Tuten, Executive Assistant jtuten@jeffersoncountyfl.gov or mailed to 450 W Walnut St., Monticello, FL 32344. This project is for the construction services for widening and resurfacing and widening of CR 149 Boston Highway from SR 57 (US 319) FL/GA Parkway to Still Road. The scope will include (2) 12' travel lanes and 3' paved shoulders. Drainage improvements will include evaluating all driveway side drain pipes and miter-end sections due to their condition and to keep drainage connectivity, as needed. Signage exists within the project limits and will be evaluated to determine the need for additional signs, correcting redundant or conflicting signage and the replacement of existing signage, as needed. New thermoplastic striping and RPM's will also be included in the project. All work will be completed within existing right of way. This project is for the construction services of the widening and resurfacing of CR 149 Boston Highway from Still Road to Giley Road. This project will include widening and resurfacing the roadway to two 12' travel lanes with 3' paved shoulders. Drainage improvements will include driveway side drain pipes and miter-end sections. Signage, thermoplastic striping and RPM's will be included in the project. All work will be completed within the existing right of way.
GC Bidding
Roads / Highways
$500,000.00
Public - County
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 5, 2026
July 6, 2026
Boston Hwy (CR 149), Monticello, FL
Related To This Project
Monticello, FL
Bid Date: Mar 18 2026
Monticello, FL
--
Monticello, FL
Bid Date: Jan 28 2026
Monticello, FL
Bid Date: Nov 14 2025
Monticello, FL
Bid Date: Oct 02 2025
Monticello, FL
Bid Date: Jul 09 2025
Monticello, FL
Bid Date: Jul 09 2025
Monticello, FL
Bid Date: Jun 20 2025
Monticello, FL
Bid Date: May 28 2025
Monticello, FL
Bid Date: Mar 21 2025
Monticello, FL
Bid Date: Mar 21 2025
Monticello, FL
Bid Date: Mar 05 2025
Monticello, FL
Bid Date: Jul 30 2025
Monticello, FL
Bid Date: Feb 07 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
