BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 11, 2026 at 8:00 PM

Updated May 15, 2026

Renovation of a playground / park / athletic field in Early, Texas. Completed plans call for the renovation of a playground / park / athletic field.

The purpose is to select a firm to install Synthetic Running Track Surface Retop on the existing track at Early ISD. The selected firm shall furnish all necessary resources including personnel, training programs, support, equipment, materials, services, and supplies to effectively and efficiently install the specified Synthetic Running Track Surface Retop. Each participating firm must submit a written Proposal detailing how the objectives will be achieved. Completion- July 27, 2026. Base Proposal for Synthetic Running Track Resurface Retop - Scope of Work 1. Pressure wash and clean existing surface and prep for new surface. 2. Approx. 40 SY of repair at D-zone. 3. Full depth repair near edges where required. 4. Remove and replace curb and gutter near D-zone approx.. 120 linear feet with full depth track repair near edges. 5. Provide and install +-6,183 square yards of TTS100 Retop (Red color) on the track oval, d-zone and events. Alternate 1: Gray Color Track with Purple Color Exchange Zones 6. Stripes, lettering, logos, and distance tick marks as it is on the existing track. Alternate 2: Alternative Suggestion for stripes, lettering, logos, and district tick marks.

Post-Bid

Playgrounds / Parks / Athletic Fields

$300,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 14, 2026

June 15, 2026

Project location map

101 Turtle Creek Dr, Early, TX

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.