BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 14, 2026 at 8:00 PM

Updated May 16, 2026

Site work and paving for a playground / park / athletic field in DeWitt, Iowa. Completed plans call civil work for a playground / park / athletic field.

The 2026 Bitterroot Loop Trail project is in DeWitt, Iowa and extends from the existing Paul Skeffington Memorial Trail in Westbrook Park along the north side of the Union Pacific Railroad right of way and turning north to connect with the existing trail system south of 3rd Street in the newly constructed Campbell Family Subdivision No 1. The trail will be 10' wide and 3500' in length. Construction will include 5" HMA paving, 6" stone base, subgrade stabilization, subgrade preparation, and pavement markings. Grading, erosion control, and storm sewer along the corridor will be by others. The 2026 Bitterroot Loop Trail project extends from the existing Paul Skeffington Memorial Trail in Westbrook Park along the north side of the Union Pacific Railroad right of way and turning north to connect with the existing trail system south of 3rd Street in the newly constructed Campbell Family Subdivision No 1. The trail will be 10 feet wide and 3,500 feet in length. Question Deadline 05/19/2026

GC Bidding

Playgrounds / Parks / Athletic Fields

$372,000.00

Public - City

Paving, Site Work

28

8

3

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
222
Active Projects
109
Bidding Soon
1,022
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 26, 2026

July 6, 2026

Project location map

Bitterroot Loop Trail, DeWitt, IA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.