BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 13, 2026 at 8:00 PM

Updated May 15, 2026

Site work for a water / sewer project in Calverton, New York. Completed plans call for site work for a water / sewer project.

Reference Number 0000423043 - Bid Bond 5 % - Performance Bond 10 % General Requirements - Bid Deposit Required - Certified Payroll - Contractors License Required - Federally Funded - Insurance Required - License Required - Prevailing Wage Required Bid Intent Optional Bid Intent Deadline 05/15/2026 05:00 PM EDT Question Deadline 05/15/2026 at 11:00 AM ET All communication concerning this Solicitation should be addressed to the SCWA's Purchasing Department, John Deubel, 631-292-6032 or at John.Deubel@scwa.com. Disadvantaged Business Enterprises are encouraged to bid. The work to be done consists of the final restoration of disturbed roadways and grassy areas from the installation of water main and water services. The contractor shall furnish all labor, tools, and equipment required to excavate, sub grade, and cut the edge of the pavement along the trench to make a straight edge where required by the highway department having jurisdiction. The contractor shall cart away all material as it is removed from the trench and dispose of same. Al dust, dirt, and debris shall be brushed off the highway and disposed of by the contractor. No pavement cuts are to be left unfilled overnight. The contractor shall supply asphalt tickets for all asphalt supplied on a daily basis to the inspector on site the day of delivery unless otherwise ordered by the Authority's Engineer. The contractor shall furnish all labor, tools, and equipment for breaking down the road surfaces and disposing of the debris in a lawful manner from the job. All patches shall be cut back at distances specified by the Authority's Engineer. Cutbacks shall be made with a diamond saw unless another method is approved by the Authority's Engineer and the local Highway Department. All temporary type bituminous paving placed previously by others is to be cut out, removed, and replaced as well as any erupted or settled area adjacent or near the patch. Al valve boxes and manholes and other castings shall be set to the proper grade before any paving replacement is made. All work shall be done for the unit price. The contractor shall have available all labor, tools, and sufficient grading equipment required to complete topsoil replacement and seeding work.

GC Bidding

Water / Sewer

$700,000.00

Public - County

Site Work

9

9

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
747
Active Projects
341
Bidding Soon
4,041
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 20, 2026

June 19, 2026

Project location map

S River Rd, Calverton, NY

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.