BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 14, 2026 at 8:00 PM

Updated May 14, 2026

Renovation of an educational facility in Blair, Nebraska. Completed plans call for the renovation of a educational facility.

Question Deadline 05/26/2026During the bidding period, all questions regarding the meaning or intent of the Bidding Documents shall be directed to Eileen Korth, Project Architect or Lily Pinkall, Project Manager, at Jackson-Jackson & Associates, 6912 North 97 th Circle, Suite 1, Omaha, Nebraska 68114 (Tele: 402/391-3999; Email: lpinkall@jjaarchitects.com OR ekorth@jjaarchitects.com) All Structural questions regarding the Project shall be directed to the Structural Engineer, InfraStructure, LLC, 6910 Pacific Street, Omaha, Nebraska 68106 (Tele: 402/553-0234). Name: Jeffrey S. Payne, P.E (email: jpayne@is-ecg.com) D. All Mechanical questions regarding the Project shall be directed to the Mechanical Engineer, Wyatt Wirges, Engineering Technologies, 1101 North 13 th Street, Omaha, Nebraska 68102. (Tele: 402-330-2772). (email: wwirges@eti-engineers.com) E. All Plumbing questions regarding the Project shall be directed to the Mechanical Engineer, Kristy Leddy Alvine Engineering, 1201 Cass Street, Omaha, Nebraska 68102 (Tele: 402/346-7007) (email: kleddy@alvine.com) F. All Electrical and Technology questions regarding the Project shall be directed to the Electrical Engineer, Heidi Li, Engineering Technologies, 1101 North 13 th Street, Omaha, Nebraska 68102. (Tele: 402-330-2772). (email: hli@eti-engineers.com) Questions received less than forty-eight (48) hours prior to bid opening will not be answered. If the bid is sent by mail, it shall be enclosed in a separate mailing envelope with notation, "Sealed Bid Enclosed," on the face thereof and shall be directed to: Dr. Don Johnson, Superintendent, at the office of the Owner, Blair Community Schools, located at 1326 Park Street, Blair, Nebraska 68008. The Work of this Contract comprises all general construction work associated with the renovation of an existing 900 square feet classroom space off the existing main entry vestibule into a controlled entry Attendance/Reception/Waiting Area, Assistant Principal's Office, and Conference Room. Additionally, the former Computer Lab on the west side of the library will receive a new door off the west corridor and minor modifications to accommodate the relocation of the Ag Classroom that will be displaced by the above noted classroom renovation into Administrative space adjacent to the main entry. Work to be completed at Otte Middle School, Blair, Nebraska. Work shall be completed in accordance with the Contract Documents

GC Bidding

Educational

$650,000.00

Public - City

Renovation

17

22

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
107
Active Projects
65
Bidding Soon
581
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 28, 2026

June 29, 2026

Project location map

555 Jackson St, Blair, NE

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.