Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 13, 2026 at 8:00 PM
Updated May 16, 2026
Site work for a water / sewer project in Maple Ridge, British Columbia. Completed plans call for site work for a water / sewer project.
The successful contractor shall furnish all labour, equipment, materials, traffic control, and disposal required to complete the following for each manhole: a. Mobilization and Traffic Control Mobilize crews and equipment to MRN corridors. Implement traffic control in accordance with MMCD standards, MOTI traffic control guidelines, and WorkSafeBC regulations. Phase work to minimize disruption on high-volume MRN roadways. b. Site Preparation and Asphalt Removal Perform a radial saw-cut around each manhole. Remove and dispose of asphalt to expose the existing frame and chimney structure. c. Manhole Frame and Cover Rehabilitation Remove existing manhole frame and cover. Remove existing concrete rings. Install new rings and adjustable riser section Reset, adjust, or replace frame and cover as required to achieve final road grade. City to provide frame and cover if replacement required. Ensure cover is flush, level, and secure with no rocking or vertical deflection. d. Concrete Collar Installation Prepare and compact sub-base as necessary. Place reinforced high early strength (minimum 32 MPa) concrete collar to fill the circular cut area. Finish collar flush with surrounding pavement, ensuring smooth transition and proper drainage. Cure in accordance with specifications before reopening to traffic. e. Final Inspection and Site Restoration Remove debris and construction materials. Ensure traffic markings and surrounding surfaces are restored to City standards. Submit each rehabilitated location for City inspection and approval. 3. Schedule Work is to be completed within the time specified. Contractor shall propose a phasing and sequencing plan for MRN corridors to coordinate with traffic volumes, paving programs, and City operations. Production rates shall ensure completion of approximately 50–150 manholes within the approved contract window. 4. Quality Assurance All work must meet City of Maple Ridge Engineering Standards, MMCD specifications, and applicable CSA standards. The City reserves the right to inspect at any stage and direct corrective actions as required. Documents can be obtained from https://mapleridge.bidsandtenders.ca/ Question Deadline: Thu May 14, 2026 11:59 PM (PDT)
GC Bidding
Water / Sewer
$1,000,000.00
Public - City
Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
