BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 12, 2026 at 8:00 PM

Updated May 16, 2026

Demolition and site work for a water / sewer project in Granby, Colorado. Completed plans call for the demolition of a water / sewer project; and for site work for a water / sewer project.

Provide all labor, materials, and equipment for the Meadow Creek Dam Upstream Control, including demolition of the existing trash rack and 42-inch butterfly valve; installation of OWNER furnished 42-inch knife gate valve and hydraulic power unit; installation of small diameter hydraulic supply and return lines between valve cylinder and hydraulic power unit; fabrication and installation of new trash rack; diverting reservoir inflows and maintaining downstream river flows during the replacement work; startup and commissioning of OWNER furnished 42-inch knife gate and hydraulic power unit. Quotes are requested for welding, miscellaneous metals, coffer dam, shoring, piping, bypass pumping, aggregate suppliers, trucking, and electrical work. Work items can be separated into smaller tasks or quantities if needed for participation. All potential subcontractors must be prepared to provide a 100% Payment and Performance Bond from a US Treasury listed Surety Company. Garney will reimburse subcontractors for the required bond premium; bond rate should be provided at the time of bid. Standard Purchase Order and Subcontract documents will be used as the basis of contracting. Exceptions to these documents should be sent with the quote. Current certifications showing MWBE status must accompany the quote if applicable. The participation goal for the project is 3%.

Sub-Bidding

Water / Sewer

$4,000,000.00

Public - City

Demolition, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
263
Active Projects
117
Bidding Soon
1,315
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 21, 2026

July 5, 2026

Project location map

Multiple Locations, Granby, CO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.