Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 8, 2026 at 8:00 PM
Updated May 16, 2026
Site work and renovation of a water / sewer project in Willis, Texas. Completed plans call civil work for a water / sewer project.
Scope of Work of the Contract Documents includes the following: Sanitary Sewers Rehabilitation by CIPP, Pipe Bursting, Point Repair, or Slip Lining. Sanitary Sewer Rehabilitation Phase 2 to serve Corinthian Point Municipal Utility District No. 2. The project includes pre-construction and post-construction cleaning and televising of sanitary sewer lines; traffic control, site restoration, and all incidental work necessary to complete the project; rehabilitation of sanitary sewer mains using CIPP lining, pipe bursting, and slip lining methods, including reconnection of service laterals and all associated appurtenances; performing point repairs of existing sanitary sewer mains, including excavation, pipe replacement, backfill, and all associated appurtenances; rehabilitation and adjustment of existing sanitary sewer manholes, including replacement, frame and cover adjustment, and watertight grouting; heavy cleaning of sewer lines, including removal of debris, grease, and roots to restore flow capacity; and clean-up of the project area upon completion.
GC Bidding
Water / Sewer
$1,500,000.00
Public - County
Renovation, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
13
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 28, 2026
July 12, 2026
Multiple locations, Willis, TX
Related To This Project
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
