Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published June 8, 2026 at 8:00 PM
Updated October 12, 2026
Site work for a civil project in Kirkland Lake, Ontario. Conceptual plans call for site work for a water / sewer project; and bridge / tunnel.
Location 1 – Allen Avenue Storm Sewer System Reconstruction and expansion of the existing storm sewer system. Reconfiguration of the storm system to improve hydraulic performance. Adjustments to align the storm system with the creek bottom elevation. Installation of new access and maintenance structures. Overall objective: improve flow capacity, reduce flood risk, and enhance long-term maintainability. Allen Avenue just north of Murdock Creek The storm sewer below Allen Avenue discharges to a 1600 mm diameter corrugated steel pip (CSP) culvert, which conveys Murdock Creek below the Allen Avenue crossing and public property to the southwest. However, as show in Schedule A – Images – Storm Outlet on Allen Avenue, the 1600 mm diameter culvert is at a significantly higher elevation than that of the storm sewer invert, which necessitates surcharging in the storm sewer to discharge storm water into the piped creek. Location 2 – Rand Creek Culvert Crossings (Baron Street & Earl Street) Replacement of the existing twin steel culverts at Earl Street, which have exceeded their service life and are affected by sediment-related capacity restrictions. Installation of new concrete box culverts to improve hydraulic capacity, structural integrity, and long-term resilience. Two-stage construction approach to maintain access and manage construction sequencing: Stage 1 – Baron Street Construction of a new concrete box culvert at Baron Street, at the location of a former bridge structure, including the full reconstruction of the roadway and associated approaches. Stage 2 – Earl Street Once the Baron Street crossing is complete and operational, the existing culverts at Earl Street will be removed and replaced with a concrete box culvert. TIMELINE: An RFP for engineering and project management services has been issued by the owner. The approved project includes two related stormwater infrastructure improvements, delivered as a coordinated system-wide flood mitigation initiative. Provincial funding has been secured, with design work scheduled for 2026 and construction anticipated to occur over two construction seasons (2027–2028).
Conceptual
Water / Sewer
$3,000,000.00
Public - State/Provincial
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 10, 2027
3 Kirkland Street, Kirkland Lake, ON
Related To This Project
Kirkland Lake, ON
Bid Date: Jun 16 2026
Kirkland Lake, ON
Bid Date: Jun 09 2026
Kirkland Lake, ON
Bid Date: Jun 11 2026
Kirkland Lake, ON
Bid Date: Jun 17 2026
Kirkland Lake, ON
Bid Date: Aug 05 2026
Kirkland Lake, ON
Bid Date: Aug 31 2026
Kirkland Lake, ON
Bid Date: Oct 07 2026
Kirkland Lake, ON
Bid Date: May 08 2026
Kirkland Lake, ON
Bid Date: Apr 15 2026
Kirkland Lake, ON
Bid Date: Mar 06 2026
Kirkland Lake, ON
Bid Date: Nov 20 2025
Kirkland Lake, ON
Bid Date: Sep 04 2025
Kirkland Lake, ON
--
Kirkland Lake, ON
Bid Date: Jun 02 2026
Kirkland Lake, ON
Bid Date: Aug 01 2025
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed