Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 14, 2026 at 8:00 PM
Updated May 15, 2026
Renovation of a recreation facility in El Centro, California. Completed plans call for the renovation of a recreation facility.
Provide all design and construction necessary to renovate and modernize the existing eight-lane Bowling Center (Building 485) to produce a complete and useable facility. The work includes replacement of the existing pinsetter units with new pinsetter units incorporating string bowling, development of an electronic gaming area, and renovation of food operations. The project includes all required demolition, installation, renovation, temporary construction, and restoration activities necessary to support the upgrades. The contractor shall perform all required site investigations, including surveys and utility locates such as subsurface utility potholing, as necessary to complete the design and construction of the project. All site investigation activities shall be coordinated with appropriate installation personnel through the Contracting Officer's Representative. The contractor shall provide complete architectural, civil, structural, mechanical, electrical, landscape, and fire protection design services required to construct the facility in compliance with all applicable codes, laws, and requirements, including all design submittals identified in the RFP. All questions regarding the design, coordination, or interpretation of RFP requirements during the proposal phase shall be directed in writing to the Contracting Officer prior to submitting an offer, There will be a virtual pre-proposal conference conducted via MS Teams on/at TBD. All prospective Offerors are urged to attend this conference. In order to make this conference as productive as possible, Offerors are requested to submit all questions via E-Mail to the Contracting Officer at: nika.n.maldonado.naf@us.navy.mil no later than three (3) days prior to the pre-proposal conference The contractor shall furnish all materials, furnishings, equipment, fixtures, and accessories required for a fully operational facility, and shall be responsible for all material handling, staging, transportation, delivery, loading, unloading, and any lifting equipment necessary during all phases of the work. All Work shall be in accordance with the most stringent requirements of the applicable codes, laws and requirements governing Naval Air Station El Centro, City of El Centro, and all other Authorities Having Jurisdiction (AHJ). B. The Work includes, but not limited to: 1. Site Investigation: The Contractor shall provide all surveys (topographical, geotechnical, vegetative, etc.) and perform all necessary site investigation utility locates (including, but not limited to, sub-surface utility "pot holing") as required to complete the design and/or construction of the project. All site investigation activities shall be coordinated with appropriate Installation personnel through the Contracting Officer's Representative (COR). 2. Site Development and Design: The Contractor shall provide complete architectural, civil, structural, mechanical, electrical, landscape and fire protection designs, required to construct the facility in accordance with all codes, laws and requirements. The Contractor shall refer to Section H for additional information regarding design submittal requirements. 3. Materials: The Contractor shall provide all materials, furnishings, equipment and fixtures, including all required accessories, necessary to produce a complete and useable facility. Additionally, the Contractor is responsible for all material handling, staging, delivery/transportation, receipt confirmation, loading/unloading of all materials, including any lifting equipment required, during all phases of work. 4. See section J-13 attachment Project Site Assessment for project details. All the work to be done shall follow the recommendations set forth in the Site Assessment. 5. Renovation: The Contractor shall Move the bowling lanes and pin-setting machines toward the seating area by a minimum of 17 inches to achieve a 36 inch clearance between the wall and the pinspotters.
GC Bidding
Amusement and Recreation
$2,300,000.00
Public - Federal
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 9, 2026
October 9, 2026
2024 Bennett Rd, El Centro, CA
Related To This Project
El Centro, CA
Bid Date: May 05 2026
El Centro, CA
Bid Date: May 27 2026
El Centro, CA
Bid Date: Mar 12 2026
El Centro, CA
Bid Date: Mar 09 2026
El Centro, CA
Bid Date: Mar 24 2026
El Centro, CA
Bid Date: Mar 03 2026
El Centro, CA
Bid Date: Mar 05 2026
El Centro, CA
Bid Date: Mar 05 2026
El Centro, CA
Bid Date: Mar 05 2026
El Centro, CA
Bid Date: Feb 26 2026
El Centro, CA
Bid Date: Mar 13 2026
El Centro, CA
Bid Date: May 13 2026
El Centro, CA
Bid Date: Feb 16 2026
El Centro, CA
Bid Date: Feb 26 2026
El Centro, CA
Bid Date: Jan 27 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
