Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published June 30, 2026 at 8:00 PM
Updated July 7, 2026
Remodeling of a municipal facility in Fort Morgan, Colorado. Completed plans call for the remodel of a municipal facility.
Reference Number 0000423481 Question Deadline 06/02/2026 at 12:00 PM MT Questions are submitted online No Scope of Work. The contractor shall provide all labor, materials, equipment, and supervision necessary to complete the office remodel, including but not limited to: A. Demolition and Structural Modifications • Selective demolition of existing interior walls and doors, incased in brick walls where applicable • Proper removal and disposal of all demolished materials • Protection of adjacent occupied areas • Preparation of spaces for new construction B. New Construction • Construction of new interior walls and partitions as shown on the attached diagram • Installation of new doors, frames, and hardware per diagram and applicable codes Framing, drywall, finishing, and painting of all new and affected areas C. Casework and Fixtures • Installation of countertop D. Flooring and Base • Installation of new carpet throughout the remodeled area • Installation of new cove base throughout. Ceilings and Lighting • Replace all ceiling tiles in the remodeled area • Coordination of lighting modifications as required F. Electrical and Data • Provide all new electrical work as required by code • Provide new power and judicial data connections as needed. • Provide power and data at 2' below finished ceiling for wall-mounted displays as needed. Coordinate all electrical and low-voltage work to ensure full functionality H. Window Treatments • Furnish and install new surface-mounted blinds/shades on all windows within the remodeled area G. HVAC, Life Safety, and Fire System • HVAC modifications and balancing as required • Refabricate, modify, or extend the fire alarm and fire sprinkler system as required by the remodel Life-safety coordination per code • All work must meet ADA, building, electrical, mechanical, plumbing, and fire codes
Award
Municipal
$123,802.00
Public - County
Remodeling
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 10, 2026
July 10, 2026
400 Warner St, Fort Morgan, CO
Related To This Project
Fort Morgan, CO
Bid Date: May 20 2026
Fort Morgan, CO
Bid Date: May 16 2026
Fort Morgan, CO
--
Fort Morgan, CO
Bid Date: Jul 09 2026
Fort Morgan, CO
Bid Date: Jul 15 2026
Fort Morgan, CO
Bid Date: Jul 02 2026
Fort Morgan, CO
Bid Date: Aug 06 2026
Fort Morgan, CO
--
Fort Morgan, CO
Bid Date: Mar 25 2026
Fort Morgan, CO
Bid Date: Apr 14 2026
Fort Morgan, CO
Bid Date: Mar 25 2026
Fort Morgan, CO
Bid Date: Mar 18 2026
Fort Morgan, CO
Bid Date: Apr 10 2026
Fort Morgan, CO
Bid Date: Mar 20 2026
Fort Morgan, CO
--
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed