Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 11, 2026 at 8:00 PM
Updated May 16, 2026
Site work and new construction of an educational facility in Morrison, Oklahoma. Completed plans call for the construction of a educational facility.
Separate sealed proposals are invited for furnishing labor and materials for the New Athletic Training Building. The work is divided into the following bid packages: - Site Preparation, Dirtwork, and Fine Grading upon completion - Foundation Excavations, Foundation Concrete, Building Sub-Base, Aggregate Base, Moisture Barrier Membrane, Floor Slab Concrete & Reinforcing, Building and Site Concrete - Caulking and Sealants - Pull Down Access Ladder - Materials - General Trades: all carpentry materials and installations, framing, access ladder installation, wall blocking, door and hardware installations - Finish Carpentry & Millwork - Joint Sealant and Caulking - Hollow Metal Doors & Frames - Materials - Interior Signage - Materials & Installation - Coiling Door, Sectional Overhead Door, Rolling Doors - Materials & Installations - Finish Hardware, Material - Metal Framing, Insulation, Drywall, Insulation, Ceiling - Resilient Base - Painting - Pre-engineered Metal Building, Interior Wall Panels, & Insulation - Materials - Pre-engineered Metal Building, Interior Wall Panels, & Insulation - Erection/Installation - Batting Cages, Sliding Nets, Suspension Hardware - Materials and installations - Turf System - Labor, Materials, and Installation - Fire Protection - Materials & Installation - Plumbing - Materials & Installations - HVAC - Materials & Installations - Electrical Materials & Installations For a complete description of the scope for each bid package, refer to the summary of work in the project manual. Proposals must be received at the specified location by the indicated deadline. Bids received more than ninety-six hours before the time set for opening (excluding weekends and holidays), or after the time set for opening, will not be considered. A cashier's check, certified check, or surety bond in the amount of 5% of the bid is required for bids exceeding $25,000.00. The owner reserves the right to reject any or all bids and to award based on the best interest of the project. Direct questions and correspondence during the bidding phase to Roy Easley royeasley@att.net or Matt Easley matt_easley@att.net .
Sub-Bidding
Educational
$2,000,000.00
Public - City
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 28, 2026
July 27, 2026
2nd St, C Circle, Morrison, OK
Related To This Project
Morrison, OK
Bid Date: May 29 2026
Morrison, OK
Bid Date: May 07 2026
Morrison, OK
Bid Date: Mar 05 2026
Morrison, OK
Bid Date: Nov 05 2025
Morrison, OK
Bid Date: Mar 12 2025
Morrison, OK
Bid Date: Oct 19 2023
Morrison, OK
Bid Date: Aug 17 2023
Morrison, OK
Bid Date: Jun 15 2023
Morrison, OK
Bid Date: Mar 28 2023
Perry, OK
Bid Date: May 07 2026
Bethany, OK
Bid Date: May 06 2026
Durant, OK
Bid Date: May 07 2026
Broken Arrow, OK
Bid Date: May 28 2026
Oklahoma City, OK
Bid Date: May 27 2026
Oklahoma City, OK
Bid Date: May 27 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
