Published May 21, 2026 at 8:00 PM

Updated May 22, 2026

Site work for a water / sewer project in Sappington, Missouri. Completed plans call for site work for a water / sewer project.

The project consists of storm sewer installation, inlet replacement, and associated roadway and site restoration. Bid documents may be obtained from the City of Sunset Hills website or at the Drexel Technologies Plan Room. The City reserves the right to reject any or all bids and to accept the bid deemed in the best interest of the City. The City of Sunset Hills is an Equal Opportunity Employer and does not discriminate based on race, color, religion, sex, handicap, familial status, ancestry, or national origin. In a case of doubt as to the true meaning of any part of the Plans and Technical Specifications, or any other of the Bid Documents, any person who has obtained a copy of the Bid Documents may submit to the City an e-mail request to Jason Miller Project Manager at Jmiller@sunset-hills.com for an interpretation thereof no later than seven (7) days before the date set for receipt of bids. Please contact Jason Miller Project Manager at Jmiller@sunset-hills.com or 314-272-2456 for an electronic copy of the Bid Documents Proposed construction for the Project will consist generally of storm sewer improvements within the City (the "Work"), including the Contractor furnishing all labor, materials, equipment, and supervision for removal and replacement of curb inlet(s), installation of a new area inlet, approximately 50 LF of 18-inch storm sewer pipe and structures, asphalt street repair with concrete base, concrete curb repair, construction of a concrete swale, traffic control (MUTCD compliant), mobilization, clearing and grubbing, and full site restoration including seeding and straw.f in the City (the "Work"). The contractor shall furnish all labor, materials, equipment, and supervision necessary to complete the following work: o Removal and replacement of existing curb inlet o Removal existing 50 linear feet of 12-inch storm sewer pipe and inlet structure under roadway o Removal of headwall o Installation of new area inlet o Installation of approximately 50 linear feet of 18-inch storm sewer pipe (no Metal) o Installation of new storm structures o Asphalt street repair (8 inch X mix, 2-inch C mix or concrete base with 3 inch- C mix ) o Concrete curb repair (3000 psi mix) o Construction of a new concrete swale between roadway and adjacent stone wall o Grass restoration including seeding and straw o Traffic control for duration of project o Mobilization and site preparation o Clearing and grubbing as required

Post-Bid

Water / Sewer

$500,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 19, 2026

June 1, 2026

Project location map

To be determined, Sappington, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.