BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 13, 2026 at 8:00 PM

Updated May 16, 2026

Site work for a mixed-use development in Byron, Georgia. Completed plans call for site work for a residential development; and water / sewer project.

The Work includes mobilization, traffic control, erosion and sedimentation control, clearing and grading, drainage installation, demolition of existing improvements, gravel access road construction, and site restoration in accordance with the plans and specifications. All disturbed areas shall be stabilized and restored at project completion. Major storm drainage piping includes 20 LF of 72" RCP, 20 LF of temporary 54" RCP (culvert), 3,438 LF of 36" ADS HP storm pipe, 126 LF of 18" ADS HP storm pipe, and 1,298 LF of 18" HDPE. The Work also includes installation of all associated appurtenances, structures, and miscellaneous improvements necessary to complete a fully functional drainage system, including headwalls, inlets, manholes, outlet control structures, fencing, paving repairs, and erosion control measures. The time allotted for substantial completion of the work is 240 Days from the Notice to Proceed, and the time allotted for final completion of work is 270 consecutive calendar days from the Notice to Proceed. Question Deadline 05/21/2026

GC Bidding

Residential Subdivision

$500,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

14

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
131
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 28, 2026

June 29, 2026

Project location map

Manchester Place Subdivision, Byron, GA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.