BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 13, 2026 at 8:00 PM

Updated May 16, 2026

Site work, paving and renovation of a bridge / tunnel in Batavia, New York. Completed plans call for the renovation of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

The CONTRACTOR shall (a) furnish all the materials, appliances, tools and labor of every kind required, and construct and complete in the most substantial and skillful manner, the construction, improvement or reconstruction of the project on or before the completion date of December 11, 2026 as further described in Article 4, and as generally identified and shown on the contract plans entitled: Sumner Road over Elevenmile Creek Bridge Rehabilitation (B.I.N. 3315500) in accordance with the Contract Documents, which contain the information for bidders; proposal form, contract agreement, and bonds; and payment Items; and (b) do everything required by the Contract and/or Contract Documents as defined herein. Bid(5%), Performance(100%), Payment(100%) Pre-Bid Meeting No Online Q&A No Question Deadline 05/21/2026 at 12:00 PM ET Questions regarding this bid may be directed to the Purchasing Office, 15 Main Street, Batavia, NY 14020, at 585.344.2550 x2217

GC Bidding

Bridges / Tunnels

$1,000,000.00

Public - County

Paving, Renovation, Site Work

45

9

2

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
564
Active Projects
273
Bidding Soon
2,892
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 3, 2026

June 24, 2026

Project location map

Sumner St, Batavia, NY

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.